('Guardian Metal' or the 'Company')
Desert Scheelite: PM24-012 Intersects Outstanding Tungsten Mineralised Intersection
The laboratory assay results from the first diamond drillhole were covered in the Company's announcement on
Laboratory assay results from drill core samples for the next twelve holes (PM24-002 to 013) have confirmed:
1. An outstanding mineralised intersection in drill hole PM24-012 at Desert Scheelite which the Company believes will deliver a material upgrade to the resource model within this area.
2. Confirmation of a molybdenum-rich mineralised porphyry system at the Porphyry South target area.
3.
4. The balance of Desert Scheelite drillholes continue to increase confidence for updating the existing Mineral Resource estimate ("MRE").
Desert Scheelite Highlights:
§ Laboratory assay results (Table 2) confirm diamond drillhole PM24-012 at Desert Scheelite has intersected the best tungsten intercept ever recorded at Pilot Mountain including 39.3m of 'very high-grade' tungsten mineralisation.
§ The PM24-012 downhole drill intersection comprises:
o 39.3m @ 0.735% W03 (tungsten trioxide), 39.7g/t
- including 19.8m @ 1.219% W03, 69.6g/t Ag, 0.75% Cu and 0.15% Znfrom 82.5 m.
§ Significantly, the vast majority of the PM24-012 high grade intercept is located within the open pit shell as envisaged in the previous scoping level mine design and presents the opportunity to upgrade the previous block model for this area in the planned MRE update (Fig. 2). The Company believes this result will lead to a material increase in the resource model within this area.
§ PM24-012 standout extremely high-grade individual assay results include 2.90% W03 (100.8m - 102.3 downhole depth which also includes 696g/t Ag) representing the highest ever single tungsten assay result achieved across Pilot Mountain within any recorded drill programme to date.
§ Following the receipt of these outstanding assay results, the Company has moved the drill rig back to the area of Desert Scheelite where PM24-012 was undertaken to test for extensions of this zone in multiple directions.
§ The Company's CEO has scheduled a site visit commencing the end of this week to review the PM24-012 core and to evaluate core as drilling progresses from this new zone.
§ The balance of Desert Scheelite drillholes continue to increase confidence in the existing MRE. Resource upgrade and infill represents a very important step required to enable the completion of the Pre-Feasibility Study.
§ PM24-012 highlight interval above on a metal equivalent basis comprises 39.3m @ 3.45% CuEq (copper equivalent) and 1.02% WO3Eq (tungsten equivalent).
The Copper Equivalent is calculated using a tungsten price of
Cautionary note: The metal equivalent calculations do not consider any metallurgical factors and assume 100% recovery and 100% payability of all metals, as a result the stated equivalents are provided for illustrative purposes only.
Porphyry South Highlights:
§ Assay results from the Company's first ever porphyry focussed drillhole at Pilot Mountain, PM24-002 (& PM24-002A) into the Porphyry South target, has confirmed the presence of what the Company believes is an arc-related porphyry molybdenum (Mo) system.
§ Arc-related porphyry molybdenum deposits are a substantial source for molybdenum metal and may have anomalous concentrations of tungsten. The deposits typically contain low-grade mineralisation (0.03-0.22 % Mo) as molyb-denite, but are large-tonnage, making them amenable to bulk mining open-pit techniques.1
§ Mo results for PM24-002/A directly correlate with increased vein density and very highly anomalous Mo was intersected intermittently throughout the entire hole including:
From (m) |
To (m) |
Mo (ppm) # |
25 |
28 |
347 |
37 |
40 |
236 |
90.5 |
93.6 |
266 |
188.7 |
191.1 |
529 |
215.2 |
218.5 |
268 |
223.8 |
225.7 |
1,170 |
270.4 |
273.4 |
413 |
321.4 |
324 |
507 |
329.7 |
332.7 |
233 |
350.6 |
353.6 |
235 |
# ALS method ME-ICP61
§ Given recent developments regarding, 1) the delineation of the Company's Porphyry West and North Targets2as well as, 2) the possibility that W-Ag-Zn-Cu skarn-related zones at the Project may be related to one large porphyry system3, the confirmation of an Arc-related mineralised Mo porphyry system at Porphyry South is considered significant.
§ With results in hand the Company is working with all available data to place this interval within the context of the overall mineralised porphyry system(s). Notice permit amendments are awaited which cover multiple drillholes into the various porphyry targets at Pilot Mountain.
§ Future drill holes are planned to investigate areas with greater quartz vein density, which is where the potassic core associated with the highest grades in most porphyry systems is likely to be found.
§ In addition to the tungsten, copper, silver, zinc and garnet potential (currently being investigated), the confirmation of a Mo-rich porphyry adds another metal of interest to the Project going forward.
§ Given the strong copper shows found at surface across the Project, as well as within the various skarn deposits, it is believed that the porphyry may have the potential to host a copper-rich porphyry shell, and this hypothesis will be investigated further.
Desert Scheelite Parallel West (DSPW) Highlights:
§ Drillhole PM24-003, the first of two drillholes completed into the previously untested DSPW zone, returned 3.5m @ 0.235% WO3. This confirms that the DPSW skarn-zone (with a large surface expressions of circa 600m by 100m) is tungsten rich, representing another important development for the Project.
§ The Company is conducting further investigations of any at surface mineralisation within this zone to help guide future drilling into this target. Further drill pad locations are also included in the drilling permit notice amendment that was most recently submitted to enable further drilling to be undertaken at DSPW.
"It is safe to say we are extremely excited about the results reported today, including PM24-012 which has delivered a globally significant tungsten result. Not only did we intersect 39.3m of 1.02% W03Eq**, but this extended interval is located almost entirely within the scoping level open pit mine design, in an area which was previously occupied by relatively low grade material from the previous resource model.
"The drillholes reported today confirm that further exploration and drilling is needed to fully assess the Project's potential, of which we believe we have just scratched the surface. With the US
Results Summary
Table 1: Drillhole collar details
Hole ID |
Target Area |
UTM Easting# |
UTM Northing# |
Azimuth (deg.) |
Dip (deg.) |
Down hole Depth (m) |
PM24-001 |
Desert Scheelite |
424159 |
4248321 |
195 |
-75.5 |
151.8 |
PM24-002 |
Porphyry South |
424011 |
4247857 |
15.4 |
-74 |
143.6 |
PM24-002A& |
Porphyry South |
424011 |
4247857 |
15.4 |
-74 |
407.1 |
PM24-003 |
DSPW |
423792 |
4248332 |
309.5 |
-47 |
169.8 |
PM24-004 |
Desert Scheelite |
424148 |
4248353 |
177 |
-64 |
165.2 |
PM24-005 |
DSPW |
423760 |
4248287 |
311 |
-53 |
197.8 |
PM24-006 |
Desert Scheelite |
424190 |
4248354 |
181.6 |
-58 |
151.5 |
PM24-007 |
Desert Scheelite |
424367 |
4248301 |
179.2 |
-62 |
84.4 |
PM24-008 |
Desert Scheelite |
424356 |
4248297 |
175.9 |
-49 |
77.7 |
PM24-009 |
Desert Scheelite |
424376 |
4248301 |
175.3 |
-54 |
77.4 |
PM24-010 |
Desert Scheelite |
424399 |
4248296 |
173.8 |
-58 |
72.2 |
PM24-011 |
Desert Scheelite |
424407 |
4248346 |
180.4 |
-60 |
103.6 |
PM24-012 |
Desert Scheelite |
424357.6 |
4248319 |
179.6 |
-66 |
114.1 |
PM24-013 |
Desert Scheelite |
424344.2 |
4248323 |
180.5 |
-68 |
114.9 |
# UTM Zone 11 North NAD83 datum
& PM24-002 was stopped at 143.6m due to drilling difficulties, and re-entered as PM24-002A which was completed to a downhole depth of 407.1m.
Table 2: Significant Drillhole Intersections
Hole |
Downhole Depth (m) |
Interval |
W |
WO3 |
|
Zn |
|
Ag |
Cu |
Intersection Composites |
|||
ID |
From |
To |
(m) |
(ppm) a |
(%) b |
(%) c |
|
(%) d |
|
(g/t) e |
(ppm) f |
(weighted averages) c |
|
PM24-003 |
89.5 |
90.0 |
0.50 |
2,380 |
0.23 |
0.29 |
|
0.00 |
|
- |
16 |
3.5m @ 0.235 % WO3 |
|
90.0 |
93.0 |
3.00 |
1,790 |
- |
0.23 |
Δ |
0.01 |
|
- |
15 |
|||
|
|||||||||||||
PM24-004 |
87.8 |
90.5 |
2.70 |
1,690 |
- |
0.21 |
Δ |
0.03 |
|
0.6 |
90 |
19.7m @ 0.232 % WO3, 1.8 g/t Ag & 0.37% Zn |
|
90.5 |
92.0 |
1.50 |
100 |
- |
0.01 |
Δ |
0.03 |
|
- |
90 |
|||
92.0 |
93.6 |
1.60 |
2,110 |
0.20 |
0.25 |
|
0.11 |
|
1.9 |
338 |
|||
93.6 |
95.0 |
1.40 |
2,580 |
0.26 |
0.33 |
|
0.05 |
|
0.5 |
111 |
|||
95.0 |
96.6 |
1.60 |
1,920 |
- |
0.24 |
Δ |
0.06 |
|
1.5 |
231 |
|||
96.6 |
99.7 |
3.10 |
460 |
- |
0.06 |
Δ |
0.14 |
|
4.5 |
742 |
|||
99.7 |
101.2 |
1.50 |
2,370 |
0.23 |
0.29 |
|
0.08 |
|
1.2 |
242 |
|||
101.2 |
102.7 |
1.50 |
5,280 |
0.53 |
0.67 |
|
0.10 |
|
1.0 |
49 |
|||
102.7 |
104.5 |
1.80 |
2,530 |
0.25 |
0.32 |
|
0.09 |
|
0.9 |
74 |
|||
104.5 |
106.0 |
1.50 |
920 |
- |
0.12 |
Δ |
2.12 |
F |
3.0 |
613 |
|||
106.0 |
107.5 |
1.50 |
1,900 |
- |
0.24 |
Δ |
1.90 |
F |
3.0 |
219 |
|||
PM24-004 |
117.0 |
118.5 |
1.50 |
2,230 |
0.41 |
0.52 |
|
0.34 |
|
141.0 |
14 |
8.6m @ 0.303 % WO3, 43.9g/t Ag, 0.16 % Zn & 0.04 % Cu |
|
118.5 |
120.0 |
1.50 |
3,110 |
0.31 |
0.39 |
|
0.41 |
|
95.8 |
500 |
|||
120.0 |
121.5 |
1.50 |
710 |
- |
0.09 |
Δ |
0.05 |
|
3.3 |
888 |
|||
121.5 |
123.0 |
1.50 |
1,720 |
- |
0.22 |
Δ |
0.06 |
|
9.9 |
396 |
|||
123.0 |
124.1 |
1.10 |
2,320 |
0.24 |
0.30 |
|
0.03 |
|
2.3 |
582 |
|||
124.1 |
125.6 |
1.50 |
2,330 |
0.24 |
0.30 |
|
0.03 |
|
- |
81 |
|||
|
|||||||||||||
PM24-006 |
87.5 |
89.0 |
1.50 |
1,120 |
- |
0.14 |
Δ |
0.25 |
|
9.3 |
198 |
3.0m @ 0.272 % WO3, 29.85 g/t Ag, 0.52 % Zn & 0.07 % Cu |
|
89.0 |
90.5 |
1.50 |
3,380 |
0.32 |
0.40 |
|
0.80 |
|
50.4 |
1,300 |
|||
PM24-006 |
97.2 |
98.6 |
1.40 |
810 |
- |
0.10 |
Δ |
3.84 |
F |
10.4 |
775 |
20.8m @ 0.142 % WO3, 10.41 g/t Ag, 0.75 % Zn & 0.10 % Cu |
|
98.6 |
100.1 |
1.50 |
1,420 |
- |
0.18 |
Δ |
3.78 |
F |
20.2 |
593 |
|||
100.1 |
101.7 |
1.60 |
630 |
- |
0.08 |
Δ |
0.81 |
|
34.1 |
147 |
|||
101.7 |
103.2 |
1.50 |
1,220 |
- |
0.15 |
Δ |
0.76 |
|
43.2 |
184 |
|||
103.2 |
104.7 |
1.50 |
930 |
- |
0.12 |
Δ |
0.34 |
|
3.3 |
217 |
|||
104.7 |
106.2 |
1.50 |
980 |
- |
0.12 |
Δ |
0.31 |
|
3.4 |
348 |
|||
106.2 |
107.6 |
1.40 |
1,670 |
- |
0.21 |
Δ |
0.28 |
|
7.6 |
1,100 |
|||
107.6 |
108.3 |
0.70 |
2,700 |
0.42 |
0.53 |
|
0.17 |
|
2.5 |
660 |
|||
108.3 |
109.8 |
1.50 |
1,110 |
- |
0.14 |
Δ |
0.07 |
|
2.6 |
778 |
|||
109.8 |
111.3 |
1.50 |
930 |
- |
0.12 |
Δ |
0.05 |
|
1.9 |
839 |
|||
111.3 |
112.8 |
1.50 |
450 |
- |
0.06 |
Δ |
0.03 |
|
0.9 |
358 |
|||
112.8 |
113.5 |
0.70 |
500 |
- |
0.06 |
Δ |
0.04 |
|
0.7 |
431 |
|||
113.5 |
114.9 |
1.40 |
1,100 |
- |
0.14 |
Δ |
0.06 |
|
2.6 |
1,020 |
|||
114.9 |
116.4 |
1.50 |
1,340 |
- |
0.17 |
Δ |
0.13 |
|
10.3 |
6,940 |
|||
116.4 |
118.0 |
1.60 |
930 |
- |
0.12 |
Δ |
0.09 |
|
1.4 |
298 |
|||
|
|||||||||||||
PM24-007 |
38.4 |
39.7 |
1.30 |
2,030 |
0.28 |
0.35 |
|
0.16 |
|
1.8 |
194 |
5.1m @ 0.175 % WO3, 1.76 g/t Ag & 0.16 % Zn |
|
39.7 |
41.2 |
1.50 |
20 |
- |
0.00 |
Δ |
0.07 |
|
0.9 |
91 |
|||
41.2 |
42.7 |
1.50 |
1,400 |
- |
0.18 |
Δ |
0.13 |
|
3.0 |
223 |
|||
42.7 |
43.5 |
0.80 |
1,610 |
- |
0.20 |
Δ |
0.39 |
|
1.0 |
231 |
|||
|
|||||||||||||
PM24-012 |
66.0 |
67.5 |
1.50 |
2,570 |
0.29 |
0.37 |
|
0.18 |
|
6.2 |
101 |
|
39.3m @ 0.735 % WO3, 39.71 g/t Ag, 0.30 % Zn & 0.44 % Cu |
67.5 |
69.2 |
1.70 |
2,870 |
0.28 |
0.35 |
|
0.84 |
|
21.0 |
560 |
|||
69.2 |
70.7 |
1.50 |
410 |
- |
0.05 |
Δ |
0.23 |
|
1.8 |
331 |
|||
70.7 |
72.2 |
1.50 |
2,270 |
0.23 |
0.29 |
|
0.04 |
|
0.6 |
166 |
|||
72.2 |
73.1 |
0.90 |
2,630 |
0.26 |
0.33 |
|
0.03 |
|
- |
67 |
|||
73.1 |
74.4 |
1.30 |
930 |
- |
0.12 |
Δ |
0.21 |
|
20.0 |
418 |
|||
74.4 |
76.1 |
1.70 |
80 |
- |
0.01 |
Δ |
0.08 |
|
- |
40 |
|||
76.1 |
77.6 |
1.50 |
3,780 |
0.38 |
0.48 |
|
1.96 |
F |
22.2 |
4,190 |
|||
77.6 |
79.1 |
1.50 |
1,030 |
- |
0.13 |
Δ |
0.42 |
|
8.9 |
553 |
|||
79.1 |
80.6 |
1.50 |
1,130 |
- |
0.14 |
Δ |
0.60 |
|
1.1 |
175 |
|||
80.6 |
81.3 |
0.70 |
2,400 |
0.23 |
0.29 |
|
0.47 |
|
14.2 |
1,575 |
|||
81.3 |
82.5 |
1.20 |
1,950 |
- |
0.25 |
Δ |
0.64 |
|
20.7 |
5,040 |
|||
82.5 |
84.0 |
1.50 |
3,150 |
1.37 |
1.73 |
|
0.41 |
|
21.9 |
8,630 |
19.8m @ 1.219 % WO3, 69.63 g/t Ag, 0.15 % Zn & 0.75 % Cu |
||
84.0 |
85.5 |
1.50 |
2,490 |
1.39 |
1.75 |
|
0.30 |
|
38.5 |
25,900 |
|||
85.5 |
87.0 |
1.50 |
2,290 |
1.35 |
1.70 |
|
0.18 |
|
31.2 |
17,700 |
|||
87.0 |
88.5 |
1.50 |
2,220 |
1.32 |
1.66 |
|
0.11 |
|
15.3 |
7,450 |
|||
88.5 |
89.2 |
0.70 |
3,800 |
0.37 |
0.47 |
|
0.09 |
|
3.4 |
1,760 |
|||
89.2 |
90.5 |
1.30 |
1,300 |
- |
0.16 |
Δ |
0.02 |
|
- |
123 |
|||
90.5 |
92.0 |
1.50 |
3,580 |
0.35 |
0.44 |
|
0.06 |
|
0.5 |
187 |
|||
92.0 |
93.6 |
1.60 |
3,430 |
0.45 |
0.57 |
|
0.09 |
|
2.1 |
1,080 |
|||
93.6 |
95.0 |
1.40 |
2,290 |
1.26 |
1.59 |
|
0.05 |
|
2.5 |
952 |
|||
95.0 |
96.6 |
1.60 |
4,040 |
1.04 |
1.31 |
|
0.23 |
|
13.9 |
7,220 |
|||
96.6 |
98.0 |
1.40 |
4,310 |
0.73 |
0.92 |
|
0.21 |
|
10.7 |
5,110 |
|||
98.0 |
99.3 |
1.30 |
2,230 |
0.87 |
1.10 |
|
0.12 |
|
26.6 |
13,800 |
|||
99.3 |
100.8 |
1.50 |
1,980 |
- |
0.25 |
Δ |
0.14 |
|
61.7 |
8,600 |
|||
100.8 |
102.3 |
1.50 |
2,940 |
2.30 |
2.90 |
|
0.03 |
|
696.0 |
2,910 |
|||
102.3 |
103.8 |
1.50 |
2,910 |
0.30 |
0.38 |
|
0.10 |
|
9.3 |
4,860 |
|
||
103.8 |
105.3 |
1.50 |
2,180 |
0.22 |
0.28 |
|
0.39 |
|
6.8 |
1,340 |
|||
|
|||||||||||||
PM24-013 |
63.5 |
64.8 |
1.30 |
2,380 |
0.23 |
0.29 |
|
0.73 |
|
27.6 |
127 |
20.8m @ 0.228 % WO3, 11.48 g/t Ag & 0.28 % Zn |
|
64.8 |
66.3 |
1.50 |
100 |
- |
0.01 |
Δ |
0.04 |
|
0.7 |
103 |
|||
66.3 |
67.8 |
1.50 |
2,810 |
0.27 |
0.34 |
|
0.34 |
|
2.1 |
349 |
|||
67.8 |
69.2 |
1.40 |
2,000 |
0.19 |
0.24 |
|
0.62 |
|
1.1 |
376 |
|||
69.2 |
70.7 |
1.50 |
2,530 |
0.26 |
0.33 |
|
0.77 |
|
21.0 |
160 |
|||
70.7 |
72.2 |
1.50 |
2,030 |
0.20 |
0.25 |
|
0.47 |
|
103.0 |
218 |
|||
72.2 |
73.7 |
1.50 |
1,790 |
- |
0.23 |
Δ |
0.08 |
|
1.9 |
167 |
|||
73.7 |
75.3 |
1.60 |
1,390 |
- |
0.18 |
Δ |
0.04 |
|
- |
85 |
|||
75.3 |
76.8 |
1.50 |
2,250 |
0.22 |
0.28 |
|
0.03 |
|
0.6 |
234 |
|||
76.8 |
78.3 |
1.50 |
280 |
- |
0.04 |
Δ |
0.03 |
|
- |
142 |
|||
78.3 |
79.8 |
1.50 |
3,290 |
0.33 |
0.42 |
|
0.04 |
|
1.4 |
785 |
|||
79.8 |
81.4 |
1.60 |
1,430 |
- |
0.18 |
Δ |
0.06 |
|
0.5 |
265 |
|||
81.4 |
82.8 |
1.40 |
1,420 |
- |
0.18 |
Δ |
0.55 |
|
2.7 |
1,650 |
|||
82.8 |
84.3 |
1.50 |
1,960 |
- |
0.25 |
Δ |
0.27 |
|
0.5 |
173 |
|||
PM24-013 |
93.0 |
94.5 |
1.50 |
990 |
- |
0.12 |
Δ |
1.11 |
F |
87.3 |
904 |
16.8m @ 0.256 % WO3, 14.8 g/t Ag, 0.44 % Zn & 0.09 % Cu |
|
94.5 |
96.0 |
1.50 |
3,060 |
0.31 |
0.39 |
|
1.64 |
F |
56.5 |
2,100 |
|||
96.0 |
97.8 |
1.80 |
2,360 |
0.31 |
0.39 |
|
0.21 |
|
6.7 |
1,325 |
|||
97.8 |
99.3 |
1.50 |
820 |
- |
0.10 |
Δ |
0.11 |
|
0.8 |
343 |
|||
99.3 |
100.8 |
1.50 |
1,090 |
- |
0.14 |
Δ |
0.12 |
|
1.6 |
511 |
|||
100.8 |
102.3 |
1.50 |
2,030 |
0.28 |
0.35 |
|
0.13 |
|
2.5 |
980 |
|||
102.3 |
103.8 |
1.50 |
2,690 |
0.27 |
0.34 |
|
0.09 |
|
3.5 |
1,215 |
|||
103.8 |
105.3 |
1.50 |
2,790 |
0.29 |
0.37 |
|
1.40 |
F |
3.3 |
1,615 |
|||
105.3 |
106.8 |
1.50 |
1,460 |
- |
0.18 |
Δ |
0.04 |
|
1.0 |
497 |
|||
106.8 |
108.3 |
1.50 |
2,210 |
0.22 |
0.28 |
|
0.03 |
|
0.6 |
149 |
|||
108.3 |
109.8 |
1.50 |
950 |
- |
0.12 |
Δ |
0.02 |
|
0.6 |
35 |
Table 2 notes:
Summary of certificated assay results provided by accredited laboratory
ppm: parts per million, 10,000 ppm = 1%
a: ALS method ME-ICP61;
b: ALS method W-XRF10;
c: WO3 % calculated as W % multiplied by 1.2611
d: ALS method Zn-OG62
e: highest precision result from ALS method Ag-OG62(4 acid 1-1,500 ppm), AG OG46 (aqua regia 1-1,500 ppm) or ME-ICP61 0.5-100ppm Ag
f: ALS method ME-ICP61 or CU-OG62 for assays >1% Cu
Δ: denotes WO3 % calculated using W ppm (method ME-ICP61)
F: denotes Zn % calculated using Zn ppm (method ME-ICP61)
Media
Figure 1: 2024 drillhole plan map showing the location of all holes drilled to date. Cross section A-A' located in yellow (see Fig. 2 below for cross-section).
Figure 2: Cross section A-A'. North is towards A, south towards A'.
References
1: Arc-Related Porphyry Molybdenum Deposit Model.
This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014 (which forms part of domestic
COMPETENT PERSON STATEMENT
The technical information contained in this disclosure has been read and approved by Mr
Forward Looking Statements
This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.
Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.
For further information visit www.Guardianmetalresources.com or contact the following:
|
Tel: +44 (0) 20 7583 8304 |
Nominated Adviser |
Tel: +44 20 7213 0880 |
Lead Broker |
Tel: +44 (0) 20 7186 9000 |
Broker |
Tel: +44 20 7374 2212 |