Securing American energy independence

Highest Grade Lithium Clay Resource in the USA

Nevada, USA

NEVADA NORTH
LITHIUM PROJECT

Surge Battery Metals’ Nevada North Lithium Project boasts high-grade lithium clay deposits, with drill results confirming grades up to 7,630 ppm, positioning it as a promising source for the EV supply chain.

Inferred Resource: 11.24 million tonnes (LCE)

About Us

Surge Battery Metals is advancing a high-grade lithium claystone project in Nevada, comparable to the $4 billion Thacker Pass. With a track record of billion-dollar lithium deals, the company is poised to meet the surging demand for “Made in America” battery metals through sustainable, responsible sourcing. As President Donald Trump declared, “The golden era of America is now underway.” Surge Battery Metals embodies this vision by securing the nation’s lithium supply for a stronger, more independent future.

Best-In-Class
Lithium Deposit

NNLP stands out as a top-tier lithium clay deposit with high grades, optimal geometry, and surface exposure. Its free-digging, high-grade lithium beds ensure a low strip ratio and efficient extraction.

Rapid Development &
Strategic Advantage

As a third mover in lithium clay, Surge capitalizes on the lessons of industry leaders like Lithium Americas and Ioneer. From discovery in 2021 to becoming one of the USA’s largest lithium clay deposits, NNLP is advancing at an unmatched pace.

Proven Leadership &
Industry Expertise

Led by Graham Harris, who built and sold Millennial Lithium for $400M, and lithium mining expert Dr. Vijay Mehta, Surge’s team has a track record of success. CEO Greg Reimer brings high-level energy sector experience to drive strategic growth.

Strong Metallurgical
Breakthroughs

Early testing confirms high lithium recoveries via acid leaching, with 99% purity lithium carbonate already achieved. Ongoing studies aim to produce battery-grade lithium carbonate, reinforcing NNLP’s commercial viability.

Latest News

Surge Receives Positive Record of Decision on its Exploration Plan of Operations Permit at the Nevada North Lithium Project

Surge’s Nevada North Lithium Project Moves to the 30-day National Environmental Policy Act (NEPA) Environmental Assessment Public Comment Period

Surge Files NI 43-101 Technical Report